«Gazpromneft-Vostok» OJSC

A comfortable workers’ settlement for oilmen with a total area of more than 2,500 m²

Customer:

«Gazpromneft-Vostok» OJSC

Implementation dates:

May — September 2017.

Total area:

more than 2500 m²

«Gazpromneft-Vostok» operates in the Tomsk and Omsk regions. The enterprise owns six licenses for the right to use subsoil:

Shinginskiy, Zapadno-Luginetsky, Yuzhno-Pudinsky, Archinskiy, Urmansky licensed areas, as well as the southwestern part of the Krapivinskoye field.

According to the results of 2016, consolidated production of «Gazpromneft-Vostok»amounted to 1.79 mtoe.

As part of the program to increase the level of associated petroleum gas utilization in 2016, «Gazpromneft-Vostok» commissioned a gas compressor station at the Shinginskoye field and a Shiginskaya gas turbine power plant with a capacity of 24 MW, as well as built a 35-kilometer gas pipeline linking gas-transport systems to the West -Luginetsk and Shinginskoye fields.  

A comfortable workers’ settlement for oilmen with a total area of more than 2,500 m²

  • Hostel
  • Administrative and household complex
  • Canteen

We are the best

«Gazpromneft-Vostok» LLC («Gazprom Neft» PJSCenterprise) summed up the work of contractors for the second quarter of 2017 at the Shinginskoye field (Tomsk region).

About 30 companies took partin the prestigious rating. The second place with the result four out of five points was taken by the group of companies «Avista Module Engineering».

The customer assessedthe contractors by criteria such as efficiency, quality, deadlines for reporting on the work performed, deadlines for eliminating comments. Five points have not been received by any contractor. Four points were given to our and another company’s work. Almost 20 contractors were assessed as satisfactory, the rest earned only two points.

«Avista Module Engineering » GC participates in the rating of «Gazpromneft-Vostok» for the second time. According to the results of the first quarter of 2017, the company received the same assessment — four points.

«Avista Module Engineering » GC participates in the rating of «Gazpromneft-Vostok» for the second time. According to the results of the first quarter of 2017, the company received the same assessment — four points.