«RusHydro» OJSC

Workers’ settlementfor builders of Chuy HPS

previous arrow
next arrow
previous arrownext arrow
Slider
  • Customer:

    «RusHydro» OJSC

  • Implementation dates:

    February-May 2011

  • Total area:

    1546 m²

The complex of buildings includes:

modular hostel with a tambour (for 12 people) 162 m2
4 modular dormitories for workers (for 128 people) 882 m2
2-floors office building with internal staircase (for 22 people) 118 m2
a full cycle canteen (for 56 places) 252 m2
Checkpoint and medical center 36 m2

Integrated development of the workers’ settlementfor the placement of 140 hydro-builders of the Chui HPS, commissioned by «RusHydro» OJSC. The workers’ settlementis located in a picturesque mountainous area — Chibit village (Ulagansky District, Altai Republic).

Dormitories are equipped with soft and cabinet furniture, household appliances and sanitary equipment. In each residential building there is a recreation room. The office building includes offices, a conference room and a sanitary unit. The full cycle dining room is equipped with technological equipment and consists of a dining hall, a hot shop, a meat and fish shop, washing rooms for dining room and kitchen utensils, a pantry, a utility room, a staff room, a cloakroom and a bathroom with a furnishing. 

Within the framework of the project, the specialists of «Avista Module» carried out a full range of services: 

  • layout of the terrain and design of the village;
  • manufacturing of metal structures, sandwich panels and modular structures;
  • delivery of structures;
  • mounting of frame and modular buildings and metal fencing at the facility;
  • connection of buildings to external engineering networks (water supply, sewerage, power supply, ventilation, air conditioning, fire alarm);
  • furnishing of buildings.

«RusHydro» OJSC is one of the three largest Russian generating companies. The power-producing holding «RusHydro» unites more than 70 renewable energy facilities. Today, the company employs more than 18,000 people.