Warm locker room for the hockey rink of the «Stadium» MAI in Novosibirsk

previous arrow
next arrow
previous arrownext arrow
Slider
  • Customer:

    Department of Physical Culture and Sports of the town council of Novosibirsk

  • Implementation dates:

    January-February 2018

  • Total area:

    137.35 m²

As requested by the Department of Physical Culture and Sports of the town council of Novosibirsk,a warm changing room for 45 people was built on the territory of the city sports ground

In February 2018 a new hockey rink for children was opened in Novosibirsk. A modular locker room manufactured by GC»Avista Module Engineering» is located at the facility. The building area was 137.35 m². This modular building consists of 7 eight meter modules. Inside the comfortable lockerroom there are premises: 2 locker rooms with bathroom units and one common warm-up room.

Clients on cooperation